How to Maintain the water well drilling rig during the run-in period
How to Maintain the water well drilling rig during the run-in period.
1. Pay attention to the working load during the running-in period. Generally, the working load during the running-in period should not exceed 80% of the rated working load, and a suitable workload should be arranged to prevent the occurrence of overheating caused by long-term continuous operation of the machine.
2. Keep the machine clean, adjust and tighten loose parts in time to prevent the loose parts from aggravating the wear of the parts or causing the parts to be lost.
3. Pay attention to frequently check the lubricating oil, hydraulic oil, coolant, brake fluid and fuel oil (water) level and quality, and pay attention to check the seal of the whole machine. It is found that there is too much oil and water during the inspection, and the reason should be analyzed. At the same time, the lubrication of each lubrication point should be strengthened. It is recommended to add grease to the lubrication point during the running-in period (except for special requirements).
4. Pay attention to frequently observe the instructions of each instrument. If there is an abnormality, stop and remove it in time. If the cause is not found and the fault is not removed, the operation should be stopped.
5. At the end of the running-in period, the machine should be subject to mandatory maintenance, inspection and adjustment should be done, and attention should be paid to the replacement of oil.
The requirements for use and maintenance of water well drilling rigs during the running-in period can be summarized as: reducing load, paying attention to inspection, and strengthening lubrication. As long as you pay attention to and implement the maintenance and maintenance of the construction machinery during the running-in period as required, it will reduce the occurrence of early failures, prolong the service life, improve operating efficiency, and bring you more economic benefits.