KJ310 tunneling drill rig
The KJ310 full-hydraulic tunneling drill rig is specially designed for steep and inclined roadways . The maximum usable slope is 25 degrees, which is suitable for hard rock mine tunneling operations with a section of 12-35 square meters.
Product Description
The KJ310 full-hydraulic tunneling drill rig is specially designed for steep and inclined roadways . The maximum usable slope is 25 degrees, which is suitable for hard rock mine tunneling operations with a section of 12-35 square meters.
The sturdy universal drill arm has the best cross-sectional coverage shape, and the 360- degree reversal and automatic leveling of the propelling beam facilitate quick and convenient drilling positioning. The drill boom can also be used for lateral opening of stone gates and bolt drilling operations.
The drill rig's propelling beam moves horizontally, the final hole automatically stops pushing and stopping punching, slag blowing at the bottom of the hole, electronic pulse lubrication and other functions, reducing operations and improving work efficiency.
The high-frequency percussion rock drill uses stepped pistons to optimize the shock wave transmission efficiency, increase the drilling speed , reduce the consumption of drilling tools and improve the integrity of the equipment.
The spacious working space and a series of automatic functions help the driver to concentrate on drilling safely , quickly and accurately.
All repair and maintenance parts are well protected and at the same time easy to access and maintain.
Technical Parameters
Dimensions and weight | |||
length | 10700mm | ||
width | 1650mm | ||
height | 1900/2500mm | ||
weight | About 12000kg | ||
Driving speed, horizontal | 2.5km/h | ||
Maximum climbing ability | 25° | ||
Security | |||
Noise level | <100dB(A) | ||
Liftable safety ceiling | Meet the requirements of anti-rolling and anti-rock falling | ||
Drilling system | |||
Rock drill | 1×HC50/R38 | 1×HC109/R38 | 1×HC95LM/R38 |
Impact power | 13kW | 18.8kW | 21KW |
Impact flow | 105L/min | 135L/min | 100-120L/min |
Shock pressure | 130bar | 135bar | 180bar |
Maximum swing pressure | 150bar | 150bar | 210bar |
frequency | 62Hz | 47Hz | 62Hz |
Torque | 325Nm | 780Nm | 764Nm |
Aperture | Φ32-76mm | Φ42-102mm | Φ42-102mm |
Advance beam flip | 360° | ||
Propelling beam compensation stroke | 1600mm | ||
Drill boom | |||
model | K26F | ||
form | Automatic leveling | ||
Boom telescopic | 1200mm | ||
Electric hydraulic pump station | |||
Electric motor | 45kW/55kW/75kw three-phase motor | ||
Impact - propulsion - drill boom | Axial variable piston pump | ||
turn around | Gear pump | ||
Filtration accuracy | 10μ | ||
Hydraulic tank | 240L | ||
Hydraulic cooler | Water cooler | ||
Operating Voltage | 380V | ||
frequency | 50Hz | ||
Starting method | Star - triangle | ||
Cable reel | 1×F440 | ||
Reel capacity | 100m / 80m | ||
Cable outer diameter | Φ28mm / Φ32mm | ||
Cable specifications | 3×35+3G6+2×1.5 / 3×50+3G6+2×1.5 | ||
Feng Shui Road System | |||
Air compressor | 1×JN4 | ||
Displacement | 0.5m 3 /min | ||
pressure | 6-8bar | ||
Shank tail lubrication device | Electronic pulse lubrication pump | ||
Lubrication air consumption | 0.3m 3 /min | ||
Lubrication oil consumption | 180-250g/h | ||
Water pump | 1×CR3 / 1×CR5 | ||
power | 1.5kW / 5.5kw | ||
Pump displacement | 3m 3 /h / 6m 3 /h | ||
Chassis | |||
diesel engine | Cummins QSB3.9-C80-31 60KW/2200rpm | ||
Exhaust gas purification | Catalytic converter | ||
Transmission system | Two-speed motor drive crawler walking | ||
Walking brake | Multi-disc wet brake | ||
Parking brake | Multi-disc wet brake | ||
Fuel tank | 60L |